  • What will be the range of the project in PERT if nothing is mentioned about probability?? will it be (mean +SD) or ( mean+2SD) or (mean+3SD) this question is w.r.t 2000 IES objective paper 1 question number 27. ( - on ))

    1 Answer

    The overall project completion time is normally distributed with total time = sum of the times on the critical path. For normal distribution most of the area lies 3SD of either side of the mean.