X-bar and R Control Charts: Statistical Process Control Charts for NTA (UGC)-NET for 2019

Download PDF of This Page (Size: 179K)

An X-Bar and R-Chart is a type of statistical process control chart for use with continuous data collected in

subgroups at set time intervals - usually between 3 to 5 Continuous Data pieces per subgroup. The Mean (X-Bar) of each subgroup - Subgroups is charted on the top graph and the Range (R) of the subgroup is charted on the bottom graph. Out of Control points or patterns can occur on either the X-bar or R chart.

  • Like all control charts, an X-Bar and R-Chart is used to answer the following questions:

  • Is the process stable over time?

  • What is the effect of a process change on the output characteristics?

  • How will I know if the process becomes unstable, or the performance changes over time?

  • When is it used?

Constructed throughout the DMAIC process, particularly in the Measure, Analyze and Control phases of the cycle.

Used to understand process behavior, evaluate different treatments or methods, and to control a process.

Recommended for subgroup sizes of 10 or less. If the subgroup size exceeds 10, the range chart is replaced by a chart of the subgroup standard deviation, or S chart.

NOTE: It has been estimated that 98% of all processes can be effectively represented by using either the XmR charts or & R charts.

How to Construct an X-Bar and R Control Chart

and Range (or S) charts are always constructed and viewed as a pair.

To construct an X-Bar and R Chart, follow the process steps below. For subgroup sizes greater than 10, substitute the subgroup standard deviation (S) for range (R), and use constants for S from the table located after the instructional steps.

1. Record subgroup observations.

2. Calculate the average ( ) and range (R) for each subgroup.

3. Plot the and R values for each subgroup in time series. You can create a meaningful control chart from as few as 6-7 data points, although a larger sample size (20+ subgroups) will provide much more reliability. In most cases, control limits are not calculated until at least 20 subgroups of data are collected.

4. Calculate the average R value, or , and plot this value as the centerline on the R chart.

5. Based on the subgroup size, select the appropriate constant, called D4, and multiply by to determine the Upper Control Limit for the Range Chart.

6. All constants are available from the reference table.

UCL (R) =

Plot the Upper Control Limit on the R chart.

If the subgroup size is between 7 and 10, select the appropriate constant, called D3. and multiple by R-bar to determine the Lower Control Limit for

the Range Chart. There is no Lower Control Limit for the Range Chart if the subgroup size is 6 or less.

Plot the Lower Control Limit on the R chart.

7. Using the values for each subgroup, compute the average of all , or (also called the Grand Average). Plot the X-bar-bar value as the centerline on the X Chart.

8. Calculate the X-bar Chart Upper Control Limit, or upper natural process limit, by multiplying R-bar by the appropriate A2 factor (based on subgroup size) and adding that value to the average (X-bar-bar).

Plot the Upper Control Limit on the chart.

9. Calculate the X-bar Chart Lower Control Limit, or lower natural process limit, for the X-bar chart by multiplying R-bar by the appropriate A2 factor (based on subgroup size) and subtracting that value from the average (X-bar- bar).

Plot the Lower Control Limit on the chart.

10. After constructing the control chart, follow the same rules to assess stability that are used on XmR charts. Make sure to evaluate the stability of the Range

Chart before drawing any conclusions about the Averages ( ) Chart if the Range Chart is out of control, the control limits on the Averages Chart will be unreliable.

Control Chart Constants

X and R Chart
X and R Chart

and R chart

Subgroup

Size (n)

2

1.880

0

3.267

1.128

3

1.023

0

2.574

1.693

4

0.759

0

2.282

2.059

5

0.577

0

2.114

2.326

6

0.483

0

2.004

2.534

7

0.419

0.076

1.924

2.704

8

0373

0.136

1.864

2.847

9

0.337

0.184

1.816

2.970

10

0.308

0.223

1.777

3.078

X and S Chart
X and S Chart

and S chart

Subgroup

Size (n)

11

0.927

0.322

1.678

12

0.886

0.354

1.646

13

0.850

0.382

1.619

14

0.817

0.407

1.593

15

0.789

0.428

1.572

Exercise: Following is a table of data sampled twelve times from a process; the process mean is supposed to be 74.000 inches. Plot these data in an X-bar R chart to determine if the process is in statistical control

(note: n = 6).

Samples
Samples

Sample #

Average

Range

1

74.030

74.002

74.019

73.992

74.006

73.999

74.008

0.038

2

73.989

74.000

74.001

73.995

73.998

74.000

73.997

0.012

3

73.998

74.002

74.050

73.989

74.005

74.030

74.012

0.061

4

74.005

74.030

73.995

74.000

73.998

73.990

74.003

0.040

5

74.006

73.990

74.004

73.998

74.000

74.002

74.000

0.016

6

73.982

73.984

73.998

73.999

73.998

73.995

73.993

0.017

7

74.003

74.002

74.008

73.992

74.006

73.999

74.002

0.016

8

73.989

74.001

74.001

73.998

73.998

74.000

73.998

0.012

9

73.998

74.002

74.001

73.989

74.006

74.030

74.004

0.061

10

74.005

74.021

73.995

73.990

73.998

73.993

74.000

0.012

11

74.004

73.995

73.998

73.998

74.006

74.002

74.001

0.061

12

73.982

73.984

73.998

73.999

73.998

73.995

73.993

0.012

74.001

0.026

Developed by: